Our team engineered and assembled a chiller and a hydronic module at our manufacturing facility for the air conditioning system of one of the production plants at the LOTTE Rakhat confectionery factory.
The installation team completed the installation, testing, and commissioning of all equipment on-site, including the chiller, condenser, hydronic module, fan coil units, and a uniform air distribution system utilizing textile (fabric) ducts.